MicroLink Data Centers
Confidential draft · placeholder figures
Capacity proposal · prepared for Anthropic 20WW

MicroLink × Anthropic

Three energised industrial sites, each ready to switch on a WW MW anchor on request, each with a contractual path to WWW MW. Built and operated by MicroLink, funded off balance sheet by Apollo, wrapped by an NVIDIA parent guarantee.

Anchor on requestWWMW · per site
Path toWWWMW · per site
Sites3US · one live LOI
StructureApollo · NVIDIA wrap
·

The three sites

High level · current path
Site
Anchor · speed
Sun Mesa, AZ
Scale · optionality
Northern PA
Third site
Anchor loadWW MWWW MWWW MW
Path toWWW MWWWW MWWWW MW
Land controlWWW haW,WWW ac · under optionW,WWW haWW,WWW ac · pre NDAWWW haW,WWW ac · in diligence
Power todayGrid plus gasFirstEnergy plus NPSEHV backbone345 and 500 kV, ex coalIn diligenceto confirm
First powerQW 20WWQW 20WWQW 20WW
InterconnectionFirstEnergyWWW kV ring busAPS front of meterWWW kV, 20WW to 20WWTo confirm
GenerationGas BTMNPS and ECPSolar, BESS, gassame POI onsiteTo confirm
StructureApollo · NVIDIAApollo · NVIDIAApollo · NVIDIA
StageLand LOI livepermitting pathwayClaims verificationdata room openEarly diligenceFort Cherry to follow
·

One structure across all three

Offtaker
Anthropic
Phased lease, rent per phase
Developer
MicroLink SPV
Bankruptcy remote, per site
Capital
Apollo
Private credit, off books
Credit wrap
NVIDIA
Parent guarantee on rent
Power partner
Per site
NPS, ECP, GigaWatt
·

Design detail

Per site · Vertiv aligned

Every site deploys the same way: factory built power and cooling blocks, integrated and tested off site, then lifted into place, so the campus scales by repetition rather than by rebuilding.

We build to 1.25 MW Vertiv aligned blocks. Power, UPS, switchgear and cooling arrive as prefabricated skids and modules, integrated in the factory, which removes up to half the on site work and holds build quality to a single standard across all three sites.

On site, the blocks drop into a prefabricated shell and tie into the SmartRun overhead busway, which carries an 800 VDC ready path to the rack. Liquid cooling runs to roughly 130 kW per rack through the CoolChip distribution units. The campus grows one block at a time, so first revenue does not wait for the full build.

800 VDC busbar 1.25 MW power block 130 kW per rack · GB300 class
Placeholder · block deployment topology
IT load250MW · per site
Power block1.25MW · Vertiv aligned
Rack density130kW · GB300 class
Busbar800 VDC ready

Sized to the Vertiv OneCore 250 reference design, with the SmartRun iMBP track busway carrying an 800 VDC ready path to the rack.